Specific procurement notice

Islamic Republic of Iran, Alborz Integrated Land and Water Management Project

Loan Number: 4782-IRN

Procurement of Laboratory Equipment (EM/G6)

The Islamic Republic of Iran has received financing from the World Bank toward the cost of the Alborz Integrated Land and Water Management Project, and it intends to apply part of the proceeds toward payments under the contract for Procurement of Laboratory Equipment (EM/G6). The Mazandaran Regional Water Company now invites sealed bids from eligible bidders for Water Quality Field Sampling, Monitoring and Laboratory Equipment. The delivery/construction period is 5 months.

Bidding will be conducted through the international competitive bidding procedures as specified in the World Bank’s Guidelines: Procurement under IBRD Loans and IDA Credits, (current edition), and is open to all eligible bidders  as defined in the guidelines.

Interested eligible bidders may obtain further information from and inspect the bidding documents from the NESPAK Company atNo. 9.9, after first crossroad, Dolat Alley, Amir Mazandarani Street, Sari, Iran, email: iwremc@ailwmp.ir, Tel: +98 (151) 2269556, Fax: +98 (151) 2253562 during office hours 08:00- 14:00 hours.

A pre-bid-meeting will take place at below address on December 1, 2008 at 11:00 a.m.

A complete set of bidding documents in English may be purchased by interested bidders on the submission of a written application to NESPAK Company at No. 9.9, after first crossroad, Dolat Alley, Amir Mazandarani Street, Sari, and upon payment of a nonrefundable fee of IRR 1,000,000 deposited to NESPAK Company account No. 1222 in Melli Bank of Iran, Amir Mazandarani Branch, Sari, Iran or USD 100 to NESPAK Company account No. 111-0002-0 in United Bank limited (Liberty Market Branch, Lahore Pakistan), Swift Code: UNILPKKA0328..The document will be sent by courier or can be collected.

All bids must be accompanied by a bid security of at least two (2) percent of bid price, and be delivered to the address below by 10:00 a.m. on December 22, 2008. They will be opened at 11:00 a.m. on December 22, 2008, in the presence of bidders’ representatives, who choose to attend, at the address below. Late bids will be rejected.

The address referred to above is:

Street Address: Ground Floor, Project implementation Unit, Mazandaran Regional Water Company, 5th Km Ghaemshahr Road
City: Sari
Country: Islamic Republic of Iran
Telephone: +98 (151) 2233815
Facsimile number: +98 (151) 2284166
Electronic mail address: PIU.MRWC@ailwmp.ir
Website: www.ailwmp.ir

1.  List of Goods and Delivery Schedule

Description of Goods Quantity, Physical unit, Final (Project Site) Destination as Specified in BDS

 

Line Item

N°

Description of Goods

Total Quantity

Physical unit

Respected Units

Delivery  (as per Incoterms) Date

Earliest Delivery Date

Latest Delivery Date

Bidder’s  offered Delivery date

 

MRWC

MDOFA

Lot 1: Base Parameters Testers

 

1

Conductivity  Meter (Portable)

3

No.

2

1

3 months

5 months

 

 

2

Conductivity Meter (Bench Type)

2

No.

1

1

3 months

5 months

 

 

3

Turbidity Meter (Bench type)

2

No.

1

1

3 months

5 months

 

 

4

PH Meter (Bench type)

2

No.

1

1

3 months

5 months

 

 

5

PH Meter (Portable)

4

No.

2

2

3 months

5 months

 

 

6

Dissolved Oxygen / DO Meter (Bench Type)

2

No.

1

1

3 months

5 months

 

 

7

Dissolved Oxygen Meter (Portable)

4

No.

2

2

3 months

5 months

 

 

8

Digital Titrators

2

No.

1

1

3 months

5 months

 

 

9

Filtration Assembly

2

No.

1

1

3 months

5 months

 

 

10

Jar Tester / Stirrer

2

No.

1

1

3 months

5 months

 

 

11

COD Reactor

2

No.

1

1

3 months

5 months

 

 

12

BOD Measurement System

2

No.

1

1

3 months

5 months

 

 

Lot 2: Laboratory Ware

 

1

Laboratory Ware (As per attached List)

2

Set

1

1

3 months

5 months

 

 

Lot 3: Chemicals

 

1

Chemical/reagents/Fixative (As per attached list)

2

Set

1

1

3 months

5 months

 

 

Lot 4: Advanced Equipments

 

1

Stereomicroscope

2

No.

1

1

3 months

5 months

 

 

2

U-Visible Spectrophotometer

2

No.

1

1

3 months

5 months

 

 

3

Analytical Balance

2

No.

1

1

3 months

5 months

 

 

4

Precision Balance

2

No.

1

1

3 months

5 months

 

 

Lot 5: Common Lab Equipments

 

1

Electrochocker

1

No.

0

1

3 months

5 months

 

 

2

Vacuum Pump

2

No.

1

1

3 months

5 months

 

 

3

Centrifuge

2

No.

1

1

3 months

5 months

 

 

4

Oven

2

No.

1

1

3 months

5 months

 

 

5

Drying Oven

2

No.

1

1

3 months

5 months

 

 

6

Laboratory Refrigerator

2

No.

1

1

3 months

5 months

 

 

Lot 6: Samplers

 

1

Plankton Net 20 μ

1

No.

0

1

3 months

5 months

 

 

2

Plankton Net 55μ

1

No.

0

1

3 months

5 months

 

 

3

Counting Chamber

1

No.

0

1

3 months

5 months

 

 

4

Grab Sampler

3

No.

2

1

3 months

5 months

 

 

5

Niskin

1

No.

0

1

3 months

5 months

 

 

6

Rottener

1

No.

0

1

3 months

5 months

 

 

7

Surber

1

No.

0

1

3 months

5 months

 

 

8

Van ven grab

1

No.

0

1

3 months

5 months

 

 

Alborz Integrated Land and Water Management Project
Central Liaison Office, 4th Floor, 106 Sepahbod Gharani, Tehran, Iran
Tel./fax +98 21 88895127-8, 88898343, 88898346

دفتر هماهنگی پروژه های مشترک با بانک جهانی؛
تهران، خیابان سپهبد قرنی، بالاتر از طالقانی، پ 106، طبقه چهارم
(+98 21) 88895127-8, 88898343, 88898346   : تلفن و نماب
ر

Email clo@ailwmp.ir, www.ailwmp.ir